Details for:

Type:
Files:
Size:

Uploaded:
By:

Seeders:
Leechers:
Info Hash:
  1. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/014 Demo - Ready.gov Business Continuity Planning Suite.mp4840.44 MiB
  2. TutsNode.com.txt63 B
  3. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/119 DR_WB08.pdf332.56 KiB
  4. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/1. Introduction to BCP and Disaster Recovery.srt782 B
  5. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/014 Demo - Ready.gov Business Continuity Planning Suite.en.srt87.44 KiB
  6. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/017 Demo - BCP from NIST - SP 800-34.en.srt30.95 KiB
  7. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/2. Introduction.srt1.89 KiB
  8. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/17. Demo - BCP from NIST - SP 800-34.srt29.68 KiB
  9. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/009 Demo - FFIEC BCP for Financial Institutions.en.srt21.11 KiB
  10. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/002 Operations_ Recovery and Restoration.en.srt11.50 KiB
  11. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/4. The Nature of Disasters - Natural.srt1.74 KiB
  12. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/004 Reasons to Develop a Comprehensive DR Plan.en.srt7.87 KiB
  13. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/005 Reasons to Develop a Comprehensive DR Plan Contd.en.srt7.56 KiB
  14. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/007 Stage 2 - BCP Team Selection.en.srt6.58 KiB
  15. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/006 Justifying DR Planning.en.srt6.50 KiB
  16. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/7. Stage 2 - BCP Team Selection.srt6.31 KiB
  17. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/7. Disaster Recovery Planning (DRP).srt1.51 KiB
  18. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/009 Other Types of Plans.en.srt5.86 KiB
  19. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/004 Documenting Test Process.en.srt5.73 KiB
  20. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/024 Service Bureaus.en.srt3.31 KiB
  21. .pad/050 B
  22. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/17. Demo - BCP from NIST - SP 800-34.mp4221.48 MiB
  23. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/10. Phases of Continuity Planning.srt2.96 KiB
  24. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/002 Project Initiation Phase.en.srt5.72 KiB
  25. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/11. Four Phases of the BCP.srt1.21 KiB
  26. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/9. Other Types of Plans.srt5.62 KiB
  27. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/008 BCP vs. DRP.en.srt5.51 KiB
  28. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/2. Project Initiation Phase.srt5.49 KiB
  29. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/003 Hardware Failure.en.srt5.41 KiB
  30. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/003 Reasons to Test.en.srt5.37 KiB
  31. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/8. BCP vs. DRP.srt5.29 KiB
  32. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/003 Definitions.en.srt5.26 KiB
  33. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/15. BCP Step 4 Approval and Implementation.srt2.71 KiB
  34. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/009 Disaster_Property Insurance Contd.en.srt5.07 KiB
  35. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/16. Module 1 Review.srt763 B
  36. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/17. Quiz 1.html137 B
  37. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/3. Definitions.srt5.06 KiB
  38. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/1. Project Scope and Planning.srt1.38 KiB
  39. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/009 BCP Documentation Contd.en.srt5.02 KiB
  40. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/003 Management Responsibility.en.srt4.99 KiB
  41. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/007 BIA Task 2_ Risk Identification.en.srt4.85 KiB
  42. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/027 Mutual Aid_Assistance Agreements.en.srt4.83 KiB
  43. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/029 Transaction Redundancy Implementations.en.srt4.82 KiB
  44. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/018 Additional DRP Factors.en.srt4.82 KiB
  45. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/4. Executive Management.srt1.96 KiB
  46. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/3. Management Responsibility.srt4.79 KiB
  47. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/5. Functional Management.srt1.41 KiB
  48. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/012 BCP Step 1_ Project Scope and Planning.en.srt4.65 KiB
  49. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/6. Stage 1 - Organizations Operations and Support Services.srt2.68 KiB
  50. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/7. BIA Task 2 Risk Identification.srt4.65 KiB
  51. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/008 Disaster_Property Insurance.en.srt4.53 KiB
  52. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/032 Recovery Plan Development Contd.en.srt4.51 KiB
  53. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/8. Stage 2 - Senior Management and BCP.srt1.06 KiB
  54. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/12. BCP Step 1 Project Scope and Planning.srt4.46 KiB
  55. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/011 Recovery Strategy Crisis Management & Emergency Communications.en.srt4.44 KiB
  56. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/012 Emergency Response.en.srt4.32 KiB
  57. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/006 Business Continuity Planning (BCP).en.srt4.27 KiB
  58. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/013 BCP and DRP Maintenance.en.srt4.26 KiB
  59. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/004 Training and Education.en.srt4.25 KiB
  60. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/6. Business Continuity Planning (BCP).srt4.09 KiB
  61. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/12. Stage 4 - Legal and Regulatory Requirements.srt1.57 KiB
  62. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/016 Backup Best Practices.en.srt4.00 KiB
  63. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/13. Other Departmental Involvement.srt1.11 KiB
  64. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/014 BCP Step 3_ Continuity Planning.en.srt3.89 KiB
  65. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/14. Other IT Departmental Issues.srt1.77 KiB
  66. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/011 Stage 4 - Legal and Regulatory Requirements.en.srt3.87 KiB
  67. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/15. Module 2 Review.srt1.02 KiB
  68. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/16. Quiz 2.html137 B
  69. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/014 Types of Backups.en.srt3.83 KiB
  70. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/1. Introduction.srt517 B
  71. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/008 BCP Documentation Contd.en.srt3.79 KiB
  72. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/010 Stage 3 - Resource Requirements.en.srt3.74 KiB
  73. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/2. Business Impact Analysis (BIA).srt1.29 KiB
  74. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/14. BCP Step 3 Continuity Planning.srt3.72 KiB
  75. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/3. BIA Types.srt2.25 KiB
  76. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/011 BIA Task 3_ Likelihood Assessment and Impact Assessment.en.srt3.71 KiB
  77. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/4. BIA Task 1 Identify Priorities.srt2.14 KiB
  78. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/11. Stage 4 - Legal and Regulatory Requirements.srt3.71 KiB
  79. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/5. BIA Task 1 Identify Priorities.srt458 B
  80. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/009 Stage 3 - Resource Requirements.en.srt3.69 KiB
  81. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/6. BIA Task 1 Identify Priorities.srt1.26 KiB
  82. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/007 BCP Documentation Contd.en.srt3.64 KiB
  83. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/021 Warm Site.en.srt3.63 KiB
  84. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/10. Stage 3 - Resource Requirements.srt3.59 KiB
  85. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/11. BIA Task 3 Likelihood Assessment and Impact Assessment.srt3.57 KiB
  86. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/005 The Nature of Disasters - Man-Made.en.srt3.54 KiB
  87. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/006 Continuity Planning Sub-Task 2_ Provisions and Processes.en.srt3.53 KiB
  88. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/9. Stage 3 - Resource Requirements.srt3.52 KiB
  89. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/10. BIA Task 3 Likelihood Assessment and Impact Assessment.srt1.50 KiB
  90. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/007 BCP and DRP Objectives.en.srt3.51 KiB
  91. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/009 BIA Task 3_ Likelihood Assessment and Impact Assessment.en.srt3.50 KiB
  92. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/5. The Nature of Disasters - Man-Made.srt3.40 KiB
  93. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/12. BIA Task 4 Resource Prioritization.srt1.13 KiB
  94. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/9. BIA Task 3 Likelihood Assessment and Impact Assessment.srt3.36 KiB
  95. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/13. BIA Task 5 BIA Reporting.srt1.67 KiB
  96. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/008 BIA Task 2_ Risk Identification.en.srt3.29 KiB
  97. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/14. BIA Task 5 BIA Reporting.srt1.52 KiB
  98. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/013 BCP Step 2_ Business Impact Assessment.en.srt3.19 KiB
  99. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/15. BIA Task 5 Maximum Tolerable Downtime (MTD).srt988 B
  100. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/8. BIA Task 2 Risk Identification.srt3.17 KiB
  101. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/16. BIA Task 5 Interdependencies.srt2.15 KiB
  102. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/010 Phases of Continuity Planning.en.srt3.08 KiB
  103. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/13. BCP Step 2 Business Impact Assessment.srt3.05 KiB
  104. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/030 Transaction Redundancy Implementations Contd.en.srt2.94 KiB
  105. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/18. Module 3 Review.srt897 B
  106. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/19. Quiz 3.html137 B
  107. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/033 Cloud Strategies.en.srt2.90 KiB
  108. [TutsNode.com] - Disaster Recovery Engineer/4. BCP Design and Development Phases/1. BCP Design and Development Phases.srt538 B
  109. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/015 BCP Step 4_ Approval and Implementation.en.srt2.83 KiB
  110. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/001 Introduction to BCP and Disaster Recovery.en.srt809 B
  111. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/006 Stage 1 - Organizations Operations and Support Services.en.srt2.80 KiB
  112. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/002 Introduction.en.srt1.97 KiB
  113. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/006 BCP Documentation.en.srt2.75 KiB
  114. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/010 Recovery Strategy Business Unit and Functional Priorities.en.srt2.63 KiB
  115. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/002 BCP Policy Draft Cycle.en.srt2.57 KiB
  116. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/004 The Nature of Disasters - Natural.en.srt1.82 KiB
  117. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/023 Mobile Sites.en.srt2.50 KiB
  118. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/025 Multiple Processing Centers _ Multiple Sites.en.srt2.47 KiB
  119. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/005 Benefits of Documenting the BCP.en.srt2.43 KiB
  120. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/017 Software Escrow Arrangements.en.srt2.36 KiB
  121. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/003 BIA Types.en.srt2.35 KiB
  122. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/007 Disaster Recovery Planning (DRP).en.srt1.57 KiB
  123. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/020 Cold Site.en.srt2.26 KiB
  124. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/016 BIA Task 5_ Interdependencies.en.srt2.24 KiB
  125. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/015 Backup Tape Formats.en.srt2.24 KiB
  126. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/002 Summary.en.srt2.22 KiB
  127. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/004 BIA Task 1_ Identify Priorities.en.srt2.22 KiB
  128. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/028 Mutual Aid_Assistance Agreements Contd.en.srt2.13 KiB
  129. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/002 BCP Step 4_ BCP Plan Approval and Implementation.en.srt2.05 KiB
  130. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/011 Four Phases of the BCP.en.srt1.26 KiB
  131. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/004 Executive Management.en.srt2.04 KiB
  132. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/011 Data Recovery Plan Maintenance.en.srt1.94 KiB
  133. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/010 Test Types_ Full-Interruption.en.srt1.86 KiB
  134. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/003 BCP Step 4_ BCP Plan Approval and Implementation Contd.en.srt1.86 KiB
  135. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/014 Other_ IT Departmental Issues.en.srt1.83 KiB
  136. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/013 BIA Task 5_ BIA Reporting.en.srt1.74 KiB
  137. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/007 Recovery Strategy Insurance Coverage.en.srt1.73 KiB
  138. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/031 Recovery Plan Development.en.srt1.73 KiB
  139. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/008 Test Types_ Simulation.en.srt1.72 KiB
  140. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/016 Module 1 Review.en.srt798 B
  141. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/008 BCP and DRP Objectives Contd.en.srt1.70 KiB
  142. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/001 Project Scope and Planning.en.srt1.44 KiB
  143. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/003 Project Management.en.srt1.67 KiB
  144. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/002 Testing the DRP.en.srt1.65 KiB
  145. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/013 Backups and Offsite Storage.en.srt1.64 KiB
  146. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/012 Stage 4 - Legal and Regulatory Requirements.en.srt1.63 KiB
  147. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/014 BIA Task 5_ BIA Reporting.en.srt1.57 KiB
  148. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/010 BIA Task 3_ Likelihood Assessment and Impact Assessment.en.srt1.57 KiB
  149. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/010 Module 5 Review.en.srt1.54 KiB
  150. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/005 Functional Management.en.srt1.46 KiB
  151. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/007 Test Types_ Structured Walk-Through.en.srt1.49 KiB
  152. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/026 Redundant Site.en.srt1.46 KiB
  153. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/006 Test Types_ Checklist.en.srt1.43 KiB
  154. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/009 Test Types_ Parallel.en.srt1.36 KiB
  155. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/002 Business Impact Analysis (BIA).en.srt1.34 KiB
  156. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/008 Stage 2 - Senior Management and BCP.en.srt1.11 KiB
  157. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/012 Work Group Recovery.en.srt1.32 KiB
  158. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/006 BIA Task 1_ Identify Priorities.en.srt1.31 KiB
  159. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/004 BCP Step 3_ Continuity Planning.en.srt1.31 KiB
  160. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/003 BCP References.en.srt1.30 KiB
  161. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/001 Conclusion and Next Steps.en.srt1.29 KiB
  162. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/005 Continuity Planning Sub-Task 1_ Strategy Development.en.srt1.26 KiB
  163. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/001 Testing and Validating the Plan.en.srt1.25 KiB
  164. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/022 Hot Site.en.srt1.25 KiB
  165. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/019 Alternate Processing Sites.en.srt1.24 KiB
  166. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/013 Other_ Departmental Involvement.en.srt1.15 KiB
  167. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/012 BIA Task 4_ Resource Prioritization.en.srt1.17 KiB
  168. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/015 Module 2 Review.en.srt1.06 KiB
  169. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/015 BIA Task 5_ Maximum Tolerable Downtime (MTD).en.srt1.01 KiB
  170. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/018 Module 3 Review.en.srt936 B
  171. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/005 Test Types.en.srt817 B
  172. [TGx]Downloaded from torrentgalaxy.to .txt585 B
  173. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/001 Introduction.en.srt536 B
  174. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/010 Module 4 Review.en.srt575 B
  175. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/001 BCP Design and Development Phases.en.srt561 B
  176. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/015 Module 6 Review.en.srt539 B
  177. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/005 BIA Task 1_ Identify Priorities.en.srt473 B
  178. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/001 BCP Plan Approval and Implementation.en.srt406 B
  179. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/034 Module 7 Review.en.srt376 B
  180. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/001 IT Recovery Strategies.en.srt347 B
  181. .pad/1148.20 KiB
  182. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/017 Demo - BCP from NIST - SP 800-34.mp4221.48 MiB
  183. .pad/2534.80 KiB
  184. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/009 Demo - FFIEC BCP for Financial Institutions.mp4170.28 MiB
  185. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/060 DR_WB05.pdf718.60 KiB
  186. .pad/322.19 KiB
  187. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/002 Operations_ Recovery and Restoration.mp459.22 MiB
  188. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/070 DR_WB06.pdf747.98 KiB
  189. .pad/454.68 KiB
  190. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/005 Reasons to Develop a Comprehensive DR Plan Contd.mp443.89 MiB
  191. .pad/5111.17 KiB
  192. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/007 Stage 2 - BCP Team Selection.mp434.95 MiB
  193. .pad/652.63 KiB
  194. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/7. Stage 2 - BCP Team Selection.mp434.95 MiB
  195. .pad/752.63 KiB
  196. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/004 Reasons to Develop a Comprehensive DR Plan.mp432.12 MiB
  197. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/050 DR_WB04.pdf682.38 KiB
  198. .pad/8218.67 KiB
  199. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/006 Justifying DR Planning.mp431.76 MiB
  200. .pad/9244.03 KiB
  201. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/029 Transaction Redundancy Implementations.mp431.25 MiB
  202. .pad/10771.16 KiB
  203. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/004 Training and Education.mp428.33 MiB
  204. .pad/11684.68 KiB
  205. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/008 BCP vs. DRP.mp427.80 MiB
  206. .pad/12207.16 KiB
  207. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/8. BCP vs. DRP.mp427.80 MiB
  208. .pad/13207.16 KiB
  209. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/6. Business Continuity Planning (BCP).mp427.30 MiB
  210. .pad/14718.64 KiB
  211. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/006 Business Continuity Planning (BCP).mp427.29 MiB
  212. .pad/15728.64 KiB
  213. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/027 Mutual Aid_Assistance Agreements.mp427.20 MiB
  214. .pad/16817.07 KiB
  215. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/9. Other Types of Plans.mp426.36 MiB
  216. .pad/17651.46 KiB
  217. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/009 Other Types of Plans.mp426.36 MiB
  218. .pad/18651.46 KiB
  219. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/7. BIA Task 2 Risk Identification.mp425.34 MiB
  220. .pad/19673.76 KiB
  221. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/007 BIA Task 2_ Risk Identification.mp425.34 MiB
  222. .pad/20673.76 KiB
  223. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/008 Disaster_Property Insurance.mp424.72 MiB
  224. .pad/21287.80 KiB
  225. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/012 Emergency Response.mp424.50 MiB
  226. .pad/22509.86 KiB
  227. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/018 Additional DRP Factors.mp424.25 MiB
  228. .pad/23772.91 KiB
  229. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/002 Project Initiation Phase.mp424.03 MiB
  230. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/1.1 DR_WB01.pdf927.04 KiB
  231. .pad/2470.73 KiB
  232. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/2. Project Initiation Phase.mp424.03 MiB
  233. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/001 DR_WB01.pdf927.04 KiB
  234. .pad/2570.73 KiB
  235. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/011 BIA Task 3_ Likelihood Assessment and Impact Assessment.mp423.39 MiB
  236. .pad/26620.32 KiB
  237. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/11. BIA Task 3 Likelihood Assessment and Impact Assessment.mp423.39 MiB
  238. .pad/27620.32 KiB
  239. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/013 BCP and DRP Maintenance.mp422.69 MiB
  240. .pad/28320.13 KiB
  241. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/014 Types of Backups.mp421.50 MiB
  242. .pad/29514.71 KiB
  243. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/008 BCP Documentation Contd.mp421.45 MiB
  244. .pad/30562.68 KiB
  245. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/011 Stage 4 - Legal and Regulatory Requirements.mp420.36 MiB
  246. .pad/31650.29 KiB
  247. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/11. Stage 4 - Legal and Regulatory Requirements.mp420.36 MiB
  248. .pad/32650.29 KiB
  249. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/011 Recovery Strategy Crisis Management & Emergency Communications.mp420.35 MiB
  250. .pad/33660.62 KiB
  251. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/003 Reasons to Test.mp420.35 MiB
  252. .pad/34669.90 KiB
  253. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/009 Disaster_Property Insurance Contd.mp420.01 MiB
  254. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/1.1 DR_WB02.pdf919.33 KiB
  255. .pad/3597.57 KiB
  256. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/007 BCP Documentation Contd.mp420.00 MiB
  257. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/017 DR_WB02.pdf919.33 KiB
  258. .pad/36101.59 KiB
  259. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/003 Hardware Failure.mp419.65 MiB
  260. .pad/37358.45 KiB
  261. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/006 Continuity Planning Sub-Task 2_ Provisions and Processes.mp419.52 MiB
  262. .pad/38490.69 KiB
  263. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/016 Backup Best Practices.mp418.89 MiB
  264. .pad/39108.84 KiB
  265. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/10. Stage 3 - Resource Requirements.mp418.88 MiB
  266. .pad/40118.85 KiB
  267. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/010 Stage 3 - Resource Requirements.mp418.88 MiB
  268. .pad/41118.85 KiB
  269. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/012 BCP Step 1_ Project Scope and Planning.mp418.87 MiB
  270. .pad/42134.83 KiB
  271. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/12. BCP Step 1 Project Scope and Planning.mp418.87 MiB
  272. .pad/43134.83 KiB
  273. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/033 Cloud Strategies.mp418.63 MiB
  274. .pad/44381.14 KiB
  275. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/010 Recovery Strategy Business Unit and Functional Priorities.mp417.48 MiB
  276. .pad/45534.32 KiB
  277. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/009 BIA Task 3_ Likelihood Assessment and Impact Assessment.mp417.46 MiB
  278. .pad/46555.73 KiB
  279. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/9. BIA Task 3 Likelihood Assessment and Impact Assessment.mp417.46 MiB
  280. .pad/47555.73 KiB
  281. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/021 Warm Site.mp417.26 MiB
  282. .pad/48757.69 KiB
  283. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/005 Benefits of Documenting the BCP.mp417.11 MiB
  284. .pad/49912.86 KiB
  285. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/024 Service Bureaus.mp416.80 MiB
  286. .pad/50200.71 KiB
  287. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/006 BCP Documentation.mp416.25 MiB
  288. .pad/51764.54 KiB
  289. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/007 BCP and DRP Objectives.mp416.20 MiB
  290. .pad/52814.80 KiB
  291. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/005 The Nature of Disasters - Man-Made.mp415.71 MiB
  292. .pad/53300.50 KiB
  293. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/5. The Nature of Disasters - Man-Made.mp415.71 MiB
  294. .pad/54300.50 KiB
  295. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/009 BCP Documentation Contd.mp415.28 MiB
  296. .pad/55734.17 KiB
  297. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/017 Software Escrow Arrangements.mp415.07 MiB
  298. .pad/56953.57 KiB
  299. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/15. BCP Step 4 Approval and Implementation.mp414.95 MiB
  300. .pad/5747.46 KiB
  301. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/015 BCP Step 4_ Approval and Implementation.mp414.95 MiB
  302. .pad/5847.46 KiB
  303. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/003 Definitions.mp414.55 MiB
  304. .pad/59457.85 KiB
  305. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/3. Definitions.mp414.55 MiB
  306. .pad/60457.85 KiB
  307. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/004 Documenting Test Process.mp414.42 MiB
  308. .pad/61598.90 KiB
  309. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/3. Management Responsibility.mp414.12 MiB
  310. .pad/62899.69 KiB
  311. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/003 Management Responsibility.mp414.12 MiB
  312. .pad/63899.69 KiB
  313. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/030 Transaction Redundancy Implementations Contd.mp414.09 MiB
  314. .pad/64927.52 KiB
  315. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/006 Stage 1 - Organizations Operations and Support Services.mp413.41 MiB
  316. .pad/65604.80 KiB
  317. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/6. Stage 1 - Organizations Operations and Support Services.mp413.41 MiB
  318. .pad/66604.80 KiB
  319. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/002 BCP Step 4_ BCP Plan Approval and Implementation.mp412.63 MiB
  320. .pad/67375.85 KiB
  321. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/14. BCP Step 3 Continuity Planning.mp412.55 MiB
  322. .pad/68457.53 KiB
  323. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/014 BCP Step 3_ Continuity Planning.mp412.55 MiB
  324. .pad/69457.53 KiB
  325. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/4. BIA Task 1 Identify Priorities.mp412.16 MiB
  326. .pad/70860.59 KiB
  327. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/004 BIA Task 1_ Identify Priorities.mp412.16 MiB
  328. .pad/71860.59 KiB
  329. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/007 Disaster Recovery Planning (DRP).mp412.08 MiB
  330. .pad/72944.54 KiB
  331. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/7. Disaster Recovery Planning (DRP).mp412.08 MiB
  332. .pad/73944.54 KiB
  333. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/013 Backups and Offsite Storage.mp412.07 MiB
  334. .pad/74956.47 KiB
  335. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/032 Recovery Plan Development Contd.mp411.92 MiB
  336. .pad/7581.39 KiB
  337. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/025 Multiple Processing Centers _ Multiple Sites.mp411.49 MiB
  338. .pad/76517.69 KiB
  339. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/009 Stage 3 - Resource Requirements.mp410.96 MiB
  340. .pad/7741.59 KiB
  341. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/9. Stage 3 - Resource Requirements.mp410.96 MiB
  342. .pad/7841.59 KiB
  343. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/020 Cold Site.mp410.30 MiB
  344. .pad/79714.05 KiB
  345. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/023 Mobile Sites.mp410.24 MiB
  346. .pad/80778.10 KiB
  347. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/8. BIA Task 2 Risk Identification.mp410.22 MiB
  348. .pad/81800.83 KiB
  349. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/008 BIA Task 2_ Risk Identification.mp410.22 MiB
  350. .pad/82800.83 KiB
  351. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/16. BIA Task 5 Interdependencies.mp49.67 MiB
  352. .pad/83335.92 KiB
  353. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/016 BIA Task 5_ Interdependencies.mp49.67 MiB
  354. .pad/84335.92 KiB
  355. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/003 BCP Step 4_ BCP Plan Approval and Implementation Contd.mp49.57 MiB
  356. .pad/85442.69 KiB
  357. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/003 BIA Types.mp49.52 MiB
  358. .pad/86492.22 KiB
  359. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/3. BIA Types.mp49.52 MiB
  360. .pad/87492.22 KiB
  361. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/010 Phases of Continuity Planning.mp49.36 MiB
  362. .pad/88656.01 KiB
  363. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/10. Phases of Continuity Planning.mp49.36 MiB
  364. .pad/89656.01 KiB
  365. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/002 BCP Policy Draft Cycle.mp49.14 MiB
  366. .pad/90885.47 KiB
  367. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/007 Recovery Strategy Insurance Coverage.mp49.13 MiB
  368. .pad/91895.83 KiB
  369. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/6. BIA Task 1 Identify Priorities.mp48.94 MiB
  370. .pad/9261.43 KiB
  371. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/006 BIA Task 1_ Identify Priorities.mp48.93 MiB
  372. .pad/9371.43 KiB
  373. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/13. BCP Step 2 Business Impact Assessment.mp48.85 MiB
  374. .pad/94155.95 KiB
  375. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/013 BCP Step 2_ Business Impact Assessment.mp48.85 MiB
  376. .pad/95155.95 KiB
  377. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/026 Redundant Site.mp48.71 MiB
  378. .pad/96292.14 KiB
  379. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/14. Other IT Departmental Issues.mp48.47 MiB
  380. .pad/97537.91 KiB
  381. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/014 Other_ IT Departmental Issues.mp48.47 MiB
  382. .pad/98537.91 KiB
  383. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/002 Summary.mp48.40 MiB
  384. .pad/99616.76 KiB
  385. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/15. BIA Task 5 Maximum Tolerable Downtime (MTD).mp48.06 MiB
  386. .pad/100960.38 KiB
  387. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/015 BIA Task 5_ Maximum Tolerable Downtime (MTD).mp48.06 MiB
  388. .pad/101960.38 KiB
  389. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/010 BIA Task 3_ Likelihood Assessment and Impact Assessment.mp47.92 MiB
  390. .pad/10283.47 KiB
  391. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/10. BIA Task 3 Likelihood Assessment and Impact Assessment.mp47.92 MiB
  392. .pad/10383.47 KiB
  393. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/028 Mutual Aid_Assistance Agreements Contd.mp47.86 MiB
  394. .pad/104141.13 KiB
  395. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/12. Stage 4 - Legal and Regulatory Requirements.mp47.86 MiB
  396. .pad/105147.34 KiB
  397. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/012 Stage 4 - Legal and Regulatory Requirements.mp47.86 MiB
  398. .pad/106147.34 KiB
  399. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/004 The Nature of Disasters - Natural.mp47.74 MiB
  400. .pad/107263.53 KiB
  401. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/4. The Nature of Disasters - Natural.mp47.74 MiB
  402. .pad/108263.53 KiB
  403. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/015 Backup Tape Formats.mp47.57 MiB
  404. .pad/109438.43 KiB
  405. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/031 Recovery Plan Development.mp47.47 MiB
  406. .pad/110546.79 KiB
  407. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/002 Testing the DRP.mp47.38 MiB
  408. .pad/111632.23 KiB
  409. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/008 BCP and DRP Objectives Contd.mp47.12 MiB
  410. .pad/112903.64 KiB
  411. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/013 BIA Task 5_ BIA Reporting.mp47.08 MiB
  412. .pad/113942.35 KiB
  413. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/13. BIA Task 5 BIA Reporting.mp47.08 MiB
  414. .pad/114942.35 KiB
  415. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/005 Continuity Planning Sub-Task 1_ Strategy Development.mp47.01 MiB
  416. .pad/1151018.15 KiB
  417. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/001 Conclusion and Next Steps.mp46.85 MiB
  418. .pad/116149.76 KiB
  419. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/2. Business Impact Analysis (BIA).mp46.80 MiB
  420. .pad/117208.06 KiB
  421. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/002 Business Impact Analysis (BIA).mp46.80 MiB
  422. .pad/118208.06 KiB
  423. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/022 Hot Site.mp46.65 MiB
  424. .pad/119353.61 KiB
  425. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/14. BIA Task 5 BIA Reporting.mp46.43 MiB
  426. .pad/120586.77 KiB
  427. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/014 BIA Task 5_ BIA Reporting.mp46.42 MiB
  428. .pad/121596.77 KiB
  429. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/008 Test Types_ Simulation.mp46.32 MiB
  430. .pad/122695.26 KiB
  431. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/012 Work Group Recovery.mp46.29 MiB
  432. .pad/123729.86 KiB
  433. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/1. Project Scope and Planning.mp46.17 MiB
  434. .pad/124854.80 KiB
  435. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/001 Project Scope and Planning.mp46.17 MiB
  436. .pad/125854.80 KiB
  437. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/006 Test Types_ Checklist.mp46.10 MiB
  438. .pad/126924.46 KiB
  439. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/12. BIA Task 4 Resource Prioritization.mp46.08 MiB
  440. .pad/127938.43 KiB
  441. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/012 BIA Task 4_ Resource Prioritization.mp46.08 MiB
  442. .pad/128938.43 KiB
  443. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/003 Project Management.mp46.06 MiB
  444. .pad/129961.71 KiB
  445. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/011 Data Recovery Plan Maintenance.mp45.65 MiB
  446. .pad/130361.38 KiB
  447. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/2. Introduction.mp45.61 MiB
  448. .pad/131397.17 KiB
  449. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/002 Introduction.mp45.61 MiB
  450. .pad/132397.17 KiB
  451. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/005 Test Types.mp45.58 MiB
  452. .pad/133431.45 KiB
  453. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/007 Test Types_ Structured Walk-Through.mp45.51 MiB
  454. .pad/134497.92 KiB
  455. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/010 Test Types_ Full-Interruption.mp45.41 MiB
  456. .pad/135607.20 KiB
  457. [TutsNode.com] - Disaster Recovery Engineer/08 Conclusion and Next Steps/003 BCP References.mp45.27 MiB
  458. .pad/136744.64 KiB
  459. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/019 Alternate Processing Sites.mp44.65 MiB
  460. .pad/137362.44 KiB
  461. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/015 Module 2 Review.mp44.57 MiB
  462. .pad/138445.15 KiB
  463. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/15. Module 2 Review.mp44.57 MiB
  464. .pad/139445.15 KiB
  465. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/010 Module 5 Review.mp44.46 MiB
  466. .pad/140552.80 KiB
  467. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/4. Executive Management.mp44.42 MiB
  468. .pad/141593.72 KiB
  469. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/004 Executive Management.mp44.42 MiB
  470. .pad/142593.72 KiB
  471. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/004 BCP Step 3_ Continuity Planning.mp44.35 MiB
  472. .pad/143661.89 KiB
  473. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/18. Module 3 Review.mp44.32 MiB
  474. .pad/144691.48 KiB
  475. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/018 Module 3 Review.mp44.32 MiB
  476. .pad/145691.48 KiB
  477. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/1. Introduction to BCP and Disaster Recovery.mp44.08 MiB
  478. .pad/146944.40 KiB
  479. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/001 Introduction to BCP and Disaster Recovery.mp44.08 MiB
  480. .pad/147944.40 KiB
  481. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/009 Test Types_ Parallel.mp43.72 MiB
  482. .pad/148284.03 KiB
  483. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/13. Other Departmental Involvement.mp43.54 MiB
  484. .pad/149470.82 KiB
  485. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/013 Other_ Departmental Involvement.mp43.54 MiB
  486. .pad/150470.82 KiB
  487. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/8. Stage 2 - Senior Management and BCP.mp43.51 MiB
  488. .pad/151506.51 KiB
  489. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/008 Stage 2 - Senior Management and BCP.mp43.51 MiB
  490. .pad/152506.51 KiB
  491. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/001 Testing and Validating the Plan.mp43.41 MiB
  492. .pad/153608.96 KiB
  493. [TutsNode.com] - Disaster Recovery Engineer/2. Project Scope and Planning/5. Functional Management.mp43.15 MiB
  494. .pad/154865.58 KiB
  495. [TutsNode.com] - Disaster Recovery Engineer/02 Project Scope and Planning/005 Functional Management.mp43.15 MiB
  496. .pad/155865.58 KiB
  497. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/16. Module 1 Review.mp43.08 MiB
  498. .pad/156938.06 KiB
  499. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/016 Module 1 Review.mp43.08 MiB
  500. .pad/157938.06 KiB
  501. [TutsNode.com] - Disaster Recovery Engineer/1. Introduction to BCP and Disaster Recovery/11. Four Phases of the BCP.mp43.05 MiB
  502. .pad/158977.42 KiB
  503. [TutsNode.com] - Disaster Recovery Engineer/01 Introduction to BCP and Disaster Recovery/011 Four Phases of the BCP.mp43.04 MiB
  504. .pad/159987.42 KiB
  505. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/001 Introduction.mp42.48 MiB
  506. .pad/160530.88 KiB
  507. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/1. Introduction.mp42.48 MiB
  508. .pad/161530.88 KiB
  509. [TutsNode.com] - Disaster Recovery Engineer/06 Testing and Validating the Plan/015 Module 6 Review.mp42.09 MiB
  510. .pad/162934.57 KiB
  511. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/5. BIA Task 1 Identify Priorities.mp41.94 MiB
  512. .pad/16361.69 KiB
  513. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/005 BIA Task 1_ Identify Priorities.mp41.94 MiB
  514. .pad/16461.69 KiB
  515. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/085 DR_WB07.pdf1.54 MiB
  516. .pad/165472.90 KiB
  517. [TutsNode.com] - Disaster Recovery Engineer/4. BCP Design and Development Phases/1. BCP Design and Development Phases.mp41.45 MiB
  518. .pad/166565.46 KiB
  519. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/001 BCP Design and Development Phases.mp41.45 MiB
  520. .pad/167565.46 KiB
  521. [TutsNode.com] - Disaster Recovery Engineer/04 BCP Design and Development Phases/010 Module 4 Review.mp41.34 MiB
  522. .pad/168680.02 KiB
  523. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/001 IT Recovery Strategies.mp41.32 MiB
  524. .pad/169700.22 KiB
  525. [TutsNode.com] - Disaster Recovery Engineer/05 BCP Plan Approval and Implementation/001 BCP Plan Approval and Implementation.mp41.29 MiB
  526. .pad/170722.23 KiB
  527. [TutsNode.com] - Disaster Recovery Engineer/07 IT Recovery Strategies/034 Module 7 Review.mp41.22 MiB
  528. .pad/171803.32 KiB
  529. [TutsNode.com] - Disaster Recovery Engineer/03 Business Impact Analysis/032 DR_WB03.pdf1.04 MiB
  530. .pad/172979.04 KiB
  531. [TutsNode.com] - Disaster Recovery Engineer/3. Business Impact Analysis/1.1 DR_WB03.pdf1.04 MiB